Perth Day Hospital is a Class 9a Type B day surgery facility for pain management and endoscopy. The project transformed a 2,000 sqm commercial building, previously used as a bowling alley, into a licensed healthcare facility.
Perfect Practice managed the project from initial concept through to operational handover. The scope included site feasibility, clinical design coordination, regulatory approvals and construction.
The conversion required a purpose-built false floor, extensive services upgrades and coordination with neighbouring strata tenancies. A dedicated ambulance bay and patient stretcher lift were integrated into the existing building.
The completed project brings specialist day surgery services into a converted commercial setting. Perth Day Hospital successfully achieved Authority to Operate through WA Health’s Licensing and Regulatory Unit.